Rick Judd | Concord, CA
3-Level Puzzle System (Gen 8) • Installed in 70 Days • RAUL™ Enabled
Project Overview
| Project Name: | Rick Judd (1313 Galindo Project) |
| Location: | 1313 Galindo St., Concord, CA |
| System Type: | 3-Level Puzzle Systems (Gen 8) |
| Groups Installed: | A (7 spaces), B (13), C (13), D (25) |
| Duration: | Installed in 70 days |
| Contract Scope: | Design • Supply • Installation • Warranty • Preventive Service |
What This Project Stands Out
- Compact Customization: Group A was custom-built for a tight footprint while maximizing efficiency.
- Multi-Directional Movement: Gen 8 carriages slide side-to-side on the 2nd level for optimized fitment.
- Smart Car Clearance Logic: Longer vehicles on 1st/3rd levels, narrower cars on 2nd.
- No Shear Wall Connections: Self-supporting systems bolted to concrete — no building tie-ins needed.
- Equipped with RAUL™: Includes live diagnostics and remote access monitoring.
“Another example of The Trivial Company delivering smarter, faster, and cleaner solutions for complex urban parking needs.”
Project Gallery