126 Spaces • 6 Groups • -1 + 2 Puzzle System • Fully Completed by Trivial
Project Overview
| Project Name: | The OLIVE – South Salt Lake City UT |
| Location: | South Salt Lake City, Utah |
| System Type: | -1 + 2 Puzzle Parking System (Three-Level Stack) |
| Total Capacity: | 126 Spaces across 6 Groups |
| Status: | Fully Completed and Operational since 2022 |
| Power: | 208 V / 120 V – 40 A Breakers (fully electric) |
| Scope: | Assembly • Wiring • Programming • Software Commissioning • Safety Retrofits |
System Highlights
- Three-Level Stack: Pit (–1), Ground (1), and Upper (+2) configuration.
- Fully Electric System: 208 V / 120 V with dedicated 40 A breakers per group.
- Custom Integration: Platforms engineered to fit between building columns for maximum density.
- Safety Enhancement: Gap Cover System protects 8-ft deep pits and column areas.
- Revival Project: Originally installed by CityLift but fully completed and commissioned by The Trivial Company.
- Performance: In continuous use since 2022 with Trivial’s ongoing maintenance and support.
“A perfect example of Trivial’s ability to turn complex, partially built systems into reliable assets that serve communities every day.”