3-Level Puzzle System (Gen 8) • Installed in 70 Days • RAUL Enabled

Thank you for reading this post, don't forget to subscribe!

Project Overview

Project Name:Rick Judd (1313 Galindo Project)
Location:1313 Galindo St., Concord, CA
System Type:3-Level Puzzle Systems (Gen 8)
Groups Installed:A (7 spaces), B (13), C (13), D (25)
Duration:Installed in 70 days
Contract Scope:Design • Supply • Installation • Warranty • Preventive Service

What This Project Stands Out

  • Compact Customization: Group A was custom-built for a tight footprint while maximizing efficiency.
  • Multi-Directional Movement: Gen 8 carriages slide side-to-side on the 2nd level for optimized fitment.
  • Smart Car Clearance Logic: Longer vehicles on 1st/3rd levels, narrower cars on 2nd.
  • No Shear Wall Connections: Self-supporting systems bolted to concrete — no building tie-ins needed.
  • Equipped with RAUL™: Includes live diagnostics and remote access monitoring.

“Another example of The Trivial Company delivering smarter, faster, and cleaner solutions for complex urban parking needs.”